Delivery & fitting

Reinforcing the joints

Strips of reinforcement mesh or separate rods are laid across the joints between the ACTIV floor components as joint reinforcement. The specifications for this reinforcement are given in the layplan.

Cleaning the panel surface

If the upper surface of the wide floor slab has become dirty, clean it in order to ensure thorough adhesion between the wide floor slab and the newly poured concrete. The surface must be made dust-free and moistened for the concreting.

Pouring the concrete

The concrete must be poured and sealed according to the required quality and consistency in one single operation. The reinforcement must not shift or sink during this operation.

Removal of the props

Only remove the props when the concrete has sufficiently hardened. It is best to comply with the provisions of the NBN B15-001 standard.